This video is all about getting prepped for your EZBuild kit installation. From checking off your tool list and sorting hardware to rallying your weekend build crew, it covers everything you need before construction begins. No build steps here – just solid advice to help you hit the ground running.
Weekend One: Putting Up the Poles
In this video, we walk through the first weekend of orchard structure setup: getting all the poles and anchors in place. It covers everything from prepping tools and marking out the layout to installing corner, side support, and centre poles with precision. You'll see how to dig one-meter-deep vertical holes, use string lines for alignment, and compact soil for stability without needing concrete. We also dig a trench for burying netting later and explain why it's best to let everything settle for a week before moving on to cables.
Weekend Two: Wires & Cables
In this video, we guide you through the second weekend of the EZBuild orchard structure: installing the cabling system that supports the netting. You'll see how to sort and prep three types of cables, apply protective sheathing, and optionally add white conduit for visibility. We install external tensioning cables first, followed by perimeter cables that form a rigid frame, and finish with internal cross wires stretched across centre and side poles. With careful tensioning and the right tools, the structure will be fully cabled and ready for netting next weekend.
Weekend Three: The Netting
This video guides viewers through the final stage of constructing their EZBuild orchard structure, focusing on installing and tensioning the protective netting. It covers essential prep steps, such as checking wire cable tension and unpacking the netting, and then walks through positioning, stretching, and securing the net across the structure. Viewers learn how to temporarily fix the netting, thread tensioning cables through it, and adjust for even coverage before permanently securing it to corner and side support poles. The video wraps up with instructions for backfilling trenches to lock the netting in place, leaving the structure sealed and ready for gate installation.